DEVELOPING METHODS OF USING WATER ENERGY IN IRRIGATION NETVORKS
Main Article Content
Abstract
The article presents the results of research on improving the reliability of electricity for the local population through small and micro hydroelectric power plants, as well as providing electricity supply to settlements located in hard-to-reach places in the event of sudden or pre-planned outages in individual energy regions or consumer power networks. In particular, the scheme of micro HPP for the Sichankul collector was developed based on the hydrological regime of the stream, topographic data of the area.
Downloads
Article Details
Section

This work is licensed under a Creative Commons Attribution 4.0 International License.
How to Cite
References
Decree of the President of the Republic of Uzbekistan dated February 7, 2017 PF-4947-con "On the development of the Republic of Uzbekistan"
Decree of the President of the Republic of Uzbekistan on May 18, 2017, PF-5044-con "On the establishment of the joint-stock company "Uzbekhydroenergo".
a. 3. Decree of the President of the Republic of Uzbekistan on May 18, 2017, PQ-2972-con "On the establishment of the activities of the joint-stock company "Uzbekhydroenergy"
Notebooks and training manuals:
Sanks MC, Tchobanoglous G, Bosserman BE, Jones GM. Pumping.
Station Design, Second Edition, Copyright © 1998 by Butterworth-Heinemann. 1067-1095 p.
28. Berdiev M.S. Study of the abrasive wear of the working wheel of pumps of small pumping stations (on the example of small pumping stations of Polythemit water consumers’ associations in Kattakorgan district)” 5A650705” Using pumping stations and devices and dissertation writer for obtaining a master’s degree in diagnostic specialty, Tashkent. 2012- 98 pages
31. http://uza.uz
32. www.gpntb.ru
33. www.energospace.ru
34. www. Ziyo.net
35. www.suvmash.uz