(1)
RE-CUTTING BENCHES IN A BLAST-BULLDOZER-BASEMENT COMPLEX DURING THE DEVELOPMENT OF “MOUNTAIN-DEPOSIT” TYPE DEPOSITS. ibast 2025, 5 (10), 333-336. https://doi.org/10.37547/.